product

Coal Mining Yard

1. Coal mining track parking yard can improve vehicle dispatching ability and work efficiency.
2. Coal mining track parking yard can switch freely between left and right directions, is flexible to operate, and can adapt to various modes of transportation.
3. Reasonable layout of coal mining track parking yard helps reduce transportation conflicts and accidents.

  • Liaoning Xinfeng
  • Diaobingshan , Tieling Liaoning
  • According to order quantity
  • About 1000 units/year
  • Information

Introduction of coal mining track parking yard:

Coal mine track turnout switch is used to store empty vehicles or make vehicles pass (when light and heavy vehicles need to intersect and pass). A set of sliding turnouts is set at each end to achieve left and right traffic switching. Usually, a group of parking lots is designed in the flatter sections of the tunnel every 500 meters. During the installation or withdrawal of equipment, a group of coal mine track turnout switch should also be added near the hydraulic support installation area to facilitate vehicle dispatching and rotation operations. Coal mine underground parking yard plays an important role in mine construction and production. This type of coal mine underground parking yard is easy and fast to lay, has strict manufacturing and acceptance standards, and its track type, track gauge, and turnout inclination series are suitable for the varied uses of my country's coal mining industry.


Coal mining track parking Yard


Data of coal mine underground parking yard:

Item

Technical Parameter

Unit

Overall Dimensions (Length×Width×Height) 

45000×4000×260/290 

mm

Track Type

30/38

kg/m

Track Gauge

600/900 

mm

Sliding Distance

1300 

mm

Total Weight of the Equipment 

≈27000 

kg 


 Application of coal mining track parking Yard:

1. Railway marshaling yard: can be used to disassemble and re-marshall freight trains, and combine new trains according to different destinations.

2. Railway freight station: used for short-term parking of freight vehicles to be loaded/unloaded.

3. Urban rail transit yard: storage, maintenance of subways or trams, and daily scheduling.

4. Underground setting: used for vehicle scheduling during equipment installation and withdrawal.


Coal mine underground parking yard

FAQ:

1. What is the main function of the coal mine track turnout switch?

A: The core function of the yard is the scheduling, marshaling, decomposition and temporary parking of equipment and vehicles.

2. What are our advantages compared with traditional yards?

A: The core advantage of the coal mine track turnout switch is flexibility, and the modular structure is easy to install and disassemble.


About us:

We are a high-tech modern enterprise integrating independent research and development, equipment manufacturing, engineering services, equipment leasing, and sales services. We have a high-quality and efficient professional team with the ability to undertake domestic and foreign mine excavation, coal mining, equipment installation, equipment maintenance and other construction.If you want to know more about our products, please feel free to contact us.


Coal mine track turnout switch


Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required